Phases of a Commercial Build-Out

Phases of a Commercial Build-Out

Understanding the Phases of a Commercial Build-Out

Phases of a Commercial Build-OutThere are many different phases of a commercial build-out. This entails a very long and detailed process, which can be frustrating with codes and regulations. Hiring a Sacramento commercial builder like Headwaters Construction Inc. to manage your project from the beginning to the end can help. This will help decrease your frustrations significantly. However, you must have some basic knowledge of each stage of the build-out. In turn, this will help decide who would be the contractor for the position. 

Knowing what each stage entails makes it easier for you to learn whether a contractor is up to the task. Additionally, it may keep you from incurring unexpected costs or delays. 

The following are the commercial build-out phases.

Design Stage

This is the stage where blueprints are designed. Structural engineers and architects are usually the ones who sign off on commercial building plans. Hiring the right Sacramento general contractor allows them to work directly with the engineer to accurately develop and implement the design.

When approaching the design reading stage, it is helpful to have commercial construction companies on hand. They will ensure that the end product built is the vision that the design carried in the long run. 

The main purpose of the design stage is to make sure that the building will be ideal for its intended use. Keeping the design of a commercial build-out functional is a good idea. You can then explore and incorporate various energy-saving elements and methods. This will be beneficial in the long run.  

Plan Approval Stage

Now that you’re done with the designs, we now venture into the plan approval stage. Here, your plans are checked against zoning restrictions and building codes to ensure that they are compliant. Your commercial builder should be capable of handling this with ease. To avoid non-compliance, have your contractor guide you from the beginning of the design process. Hiring an expert Sacramento tilt-up contractor ensures that your plans have covered the basic rules and guidelines.

Our friends over at Turek’s Plumbing, Appleton Kitchen remodel company, provided us with some great advice. Since they are in Wisconsin, they have different codes for the harsh winter. They advise that if you live in an area with additional codes for weather permits, such as Florida, you will need to ensure that your plans take that into account because of hurricane season.

Additionally, your building plans will need to be approved with sewer lines. The plans have to not only suit your needs but those of the location as well. This is why hiring an experienced general contractor in Sacramento from the get-go is important as they will advise you on all of these regulations. 

Work and Special Permits

Ensure that the commercial construction company you hired has craftsmen who are certified. In addition to this, your contractor should also know what permits apply to your commercial building project. Having your general contractor dealing with permits is both an energy and a time saver. This is because some additions to your project design may require special permits.  Your contractor is in charge of the permits, also makes them responsible for all questions raised.

Materials Needed

The matter concerning materials boils down to the trust relationship you have with your general contractor Sacramento. This is unless you are very knowledgeable on all things construction materials. While the temptation to use cost-effective materials may beckon you, you must explore all the risks involved before making your decision. Having your contractor advise you on whether this may be a good idea is highly recommended. Ensure that the grade of materials to be used is of good quality. 

Additionally, your material choice may be dependent on the environment or its intended function. Some materials may also be regulated in some cases due to the weather.

Beginning Construction

There are several stages involved in the construction phase. The construction is carried out in these stages:

  1. Laying the foundation
  2. Mechanical installations
  3. Installing roofing 
  4. Finishes

It should be noted that before construction can move to the next phase, a municipal authority official needs to assess the stage and give the go-ahead for the project to continue. Headwaters Construction Inc. cautions that this is the phase that experiences the most delays. As follows, even if the paperwork is in order and all, there may be a delay. A lot usually happens in this phase, so you should accept from the beginning that things may not go according to your timeline. 

However, your ground-up construction contractor should keep watch for any delays that may occur in the future and find ways to prevent them from happening so that the project can meet its deadline. 

Managing the Building Process

The last stage in this phase is managing the building process. Here, your contractor should also supervise any sub-contractors that may be on-site and relay information on the project’s progress at every stage.  

With the right set of professionals and an expert contractor from a reputable commercial construction company, any project, no matter the size, will run smoothly without any hitches. Headwaters Construction Inc. is just the commercial builder for you if you want a hassle-free project. Contact Headwaters Building today and let us discuss how we can bring your dream to reality.